|
FAQs
Measurement Uncertainty Analysis
Measurement Uncertainty
Calculation and Analysis
Frequently asked
questions relating to the calculation and analysis of measurement uncertainty are listed below. The answers are intended to
provide clarification and dispel common misconceptions.
If you have any questions or
comments regarding any of our measurement uncertainty analysis FAQ topics or would like us to
answer additional
questions, please contact us at
tech@isgmax.com.
Click here to access a
print quality version of the measurement uncertainty analysis questions and
answers in an Adobe Acrobat pdf file. Additional uncertainty calculation and analysis FAQs
are also available for
our Uncertainty Sidekick
Pro and UncertaintyAnalyzer
software.
Uncertainty Analysis Frequently Asked
Questions
Ó
2010, Integrated Sciences Group, All Rights Reserved. |
Question What is measurement uncertainty? |
|
Answer All measurements are accompanied by error. Measurement uncertainty is a quantification of our lack of knowledge of the sign and magnitude of measurement error. The uncertainty in the value of a measurement error is the standard deviation of the measurement error distribution. |
||
Why should I estimate measurement uncertainty?
|
Uncertainty estimates play an important role in making decisions, managing risk, developing tolerances, selecting measurement methods, developing capability statements, achieving laboratory accreditation, hypothesis testing, establishing calibration intervals and communicating technical variables. |
|||
|
How do I calculate measurement uncertainty? |
|
The basic steps for measurement uncertainty calculation are outlined below.
|
|
Shouldn't uncertainty estimates be conservative?
|
|
No. Uncertainty estimates should be based on the best available information and on appropriate estimation methods. Conservative (i.e., intentionally inaccurate) uncertainty estimates can lead to erroneous decisions. |
||
What is an uncertainty budget? |
|
An uncertainty budget provides a concise, tabulated summary of key information about the
sources of measurement error and the associated uncertainties that
contribute to the combined uncertainty in the measurement result.
The uncertainty budget
should include a brief description of each error source, along with
the appropriate error distribution, error containment limits and
associated containment probability or confidence level, the standard
uncertainty, its estimate type (A, B or A/B) and associated degrees of
freedom. |
||
What information do I need to compute a Type A uncertainty estimate? |
|
A sample of data containing repeat measurements of the quantity of interest. It is important that each repeat measurement is independent, representative and taken randomly. Type A uncertainty estimates typically use sampled values. However, the data may be comprised of sampled mean values or sampled cells. The computed statistics vary slightly depending on the sample type. |
||
What information do I need to compute a Type B uncertainty estimate? |
|
A Type B uncertainty estimate is computed from what we know about the probability distribution for a given error source. This includes information about the error containment limits and containment probability. |
||
Are error limits always stated as ± numbers? |
|
No. Error limits may be asymmetrical or even single-sided. |
||
Is it valid to assume that all errors follow the uniform (rectangular) distribution? |
|
No. The uniform distribution applies only to a very small fraction of measurement errors. Chief among these are errors due to digital readout resolution and phases of detected electromagnetic signals. In general, you must consider which distribution is applicable for each error source. It is never a recommended practice to use a one-distribution-fits-all-errors approach. |
||
Do all errors follow the normal distribution? |
|
The normal distribution applies to a wide variety of cases. However, there are several notable exceptions. Among these are bias distributions for parameters with asymmetric specifications and distributions of randomly phased electromagnetic signals. |
||
Is it acceptable to compute uncertainties using short-cuts and simplified methods, so long as everyone uses them? |
|
No. An uncertainty estimate is not an entity into
itself. The better the uncertainty estimate, the more valid the
measurement-based decision or action will be.
Uncertainty estimates obtained from overly simplified or "dumbed down"
calculation methods often give results that can lead to erroneous
decisions, regardless of agreement between users. |
||
Can a simple algorithm be used to estimate uncertainties for all sources of error? |
|
The uncertainty estimation algorithm must apply to the specific error source. As discussed above, the errors encountered in a given measurement process may not all be characterized by the same probability distribution. In some cases, iterative methods may be required to analyze the appropriate error distribution(s). |
||
Are spreadsheet applications sufficient for estimating uncertainty? |
|
In many cases, no. D eveloping and using a simplified spreadsheet or template can provide an unrealistic assessment of measurement uncertainty.
Conversely, developing rigorous analysis spreadsheets requires
considerable programming effort and technical expertise in the
mathematical and statistical methods for estimating and combining
measurement process uncertainties. This includes the evaluation
of various error distributions and error correlations, and the
calculation of sensitivity coefficients and degrees of freedom.
When developing an uncertainty analysis within a spreadsheet
application, it is difficult to ensure the integrity of equations and
macros after the spreadsheet has been widely distributed.
Spreadsheets developed with MS Excel are particularly vulnerable to
macro viruses.
Clear here to download an ISG paper that details why spreadsheets
are inadequate for uncertainty analysis. |
||
|
What information should I include when reporting an uncertainty estimate? |
|
An uncertainty estimate must be reported in a way that can be readily understood and interpreted by others. At a minimum, the measured value, the combined standard uncertainty, its estimate type (A, B or A/B) and degrees of freedom should be reported, along with a reference to the associated uncertainty analysis procedural document. In some instances, confidence limits with an associated confidence level or an expanded uncertainty with associated coverage factor may also be reported. |
|
|
How many digits should I use when reporting measured values and uncertainty estimates? |
|
The number of decimal digits used in reporting measured values and uncertainty estimates should be informative, but not misleading. It is a recommended practice to base the decimal digits on the following factors:
For example, consider a dc voltage measurement made with a device with a range setting of 0 V to 10 V and a digital resolution of 1 mV. If a single measured value is obtained, then the measured value would be reported to three decimal digits (e.g., 5.001 V). An extra decimal digit may be justified when reporting an average value obtained from repeat measurements (e.g., 5.0014 V). In either case, the number of decimal digits used to report the corresponding uncertainty should adequately convey the estimated value (e.g., 0.0006 V, 0.6 mV or 600 μV). In instances where the estimated uncertainty is very small compared to the measured value, it may be beneficial to employ scientific notation (e.g., 6 × 10-4 V). |
|
|
What should I include in my uncertainty analysis procedural document? |
|
When reporting the results of an uncertainty analysis, Section 7 of the ISO GUM recommends that the following information be included:
It is also a good practice to include a brief description of the measurement process, including the procedures and instrumentation used, as well as additional data, tables and plots that help clarify the analysis results. The analysis report should also provide sufficient calculation detail to allow others to reconstruct (recompute) the uncertainty estimates. |
|
What is the difference between standard uncertainty and expanded uncertainty? |
|
Standard uncertainty is synonymous with measurement uncertainty. Expanded uncertainty is a symmetric ± limit obtained by multiplying an uncertainty estimate by a specified coverage factor. Note: The term expanded uncertainty and uncertainty are often used interchangeably. This, of course, should be avoided because it can lead to incorrect inferences and miscommunications. |
||
What is the difference between confidence limits and expanded uncertainty? |
|
In reporting m easurement results, the combined uncertainty and its degrees of freedom can be used to establish a numerical interval that contains the true value with some confidence or probability.Confidence limits are computed assuming that the uncertainty estimate is for a combined error that follows either the normal (infinite degrees of freedom) or Student's t distribution (finite degrees of freedom) .Expanded uncertainties provide an approximate confidence limit, in which a coverage factor of k = 2 is used in place of the t-statistic. Expanded uncertainties are computed assuming a combined uncertainty estimate with infinite degrees of freedom for a combined error that is normally distributed. |
||
What is the difference between the GUM and Monte Carlo uncertainty analysis methods? |
|
Both methods require the identification and evaluation of error distributions for the measurement process being analyzed. Consequently, appropriate error distributions must be applied to achieve realistic results from either analysis method. The main difference between the GUM and Monte Carlo methods is the way that the uncertainty in the combined error is computed. The Monte Carlo method employs repeated computation of random or psuedo-random numbers to simulate and combine deviates for each error distribution. The combined uncertainty is the computed standard deviation of the combined error distribution. The GUM method employs mathematical and statistical functions to compute and combine the variances of each error distribution. The combined uncertainty is computed by taking the square-root of the combined variance. Taylor Series approximation is employed for analyzing multivariate measurements. The GUM and Monte Carlo methods can accommodate correlated errors. However, applying the Monte Carlo method to cases were the correlation coefficient is not equal to +1 is a challenging endeavor. |
||
What is uncertainty growth ? |
|
T he increase in uncertainty over time. See calibration interval analysis FAQs for more details. |
||
How do I control uncertainty growth ? |
|
Through periodic calibration of your measuring equipment . See calibration interval analysis FAQs for more details. |
Home | Company | Products | Services | Training | Updates | Freeware | Articles | Help | Links
Integrated Sciences Group
14608 Casitas Canyon Road • Bakersfield, CA 93306
Phone 1-661-872-1683 • FAX 1-661-872-3669
Privacy Policy Return Policy Shipping Info
Page Updated February 06, 2018